Sellado Túnel

i+d+i i+d+i

The objective of this project was the study and design of an application methodology based on the development of new bi-component resins, capable of solving the high number of water leaks that appeared at the joints of the segments of the tunnel section in Metro Madrid that connects the stations Barrio del Puerto and Hospital de Henares. For the successful development of the project, the application of new knowledge about waterproofing materials is of vital importance, as well as new application methodologies capable of putting a stop to the dramatic situation that affects this particular civil engineering work.


i+d+i

Components of a segment of a tunnel section.


i+d+i i+d+i

Preview of leaks between segments before the execution of the project.

i+d+i

Sample injection of the bi-component material in a section of the tunnel.

i+d+i

Primer final application on test section joints.

Solicitamos su permiso para obtener datos estadísticos de su navegación en esta web, en cumplimiento del Real Decreto-ley 13/2012. Si continúa navegando consideramos que acepta el uso de cookies. OK | Más información