New railway access platform for the High Speed Railway of Levante 
							Section: La Alcoraya – Alicante
							
							
							 Location:  Alicante (Spain)
							 Developer:   Generalitat Valenciana  
							 Budget: 70.548.502,00 € 
							 Completion year: 2010 
 
							 Execution period: 31 months    
							
							CHARACTERISTICS:
											
							The works consist of the execution of the UIC double-track railway platform for the access to Alicante for a speed of 250 km/h over a length of 9,999.883 m and, in addition, a provisional diversion of the Madrid-Alicante conventional line of 2,226.173 m. The following elementary works are included:
							- Viaduct of 99 m over the road from Pla de Vallonga to cement plant 
							- Serreta Larga tunnel, of 333 m
							- Viaduct over the A-7 and the Rambla de las  Ovejas, of 389.22 m
							- Pergola bridge over the diverted railway track  Alicante-Villena, 86.42 m
							- Freight track cross structure composed of a set of attached pergola bridges
							- Tunnelling between slurry walls, in a length of 297.88 m
							- 4 overpasses and 5 underpasses